The existing floor surface must also be free of materials that may trap block or absorb moisture or promote mold growth.
How to install dricore wall panels.
Metal stud base plates should be anchored in concrete every 2 when installing over dricore panels.
Dricore subfloor panels need minimal equipment to install as they are designed to interlock with a tongue and groove feature.
Christine of the diy dreamer recommends measuring your first row prior to installation.
Adjust the starting panel of each row to accommodate for the end of row panel width.
When installing dricore smartwall panels over existing floor surfaces the existing floor surface must be clean structurally sound and free of debris or materials that may impair the performance of the panels.
For example for every 8 length of base plate install only two concrete anchors.
How to install dricore smartwall what is dricore smartwall.
Smartwall is a high performance pre fabricated wall panel designed specifically for basement f.
Start at the longest wall and pre measure the length and width of the floor area to ensure the last panel pieces in each row end are greater than 6 in width.
Measure to include the spacer material.
Once the walls are framed and in position simply screw the bottom plates of the 2 x 4 wall to the dricore subfloor panels using 2 wood screws.
When you start your second row the panel must be at least 6 wide.